6A1-60 ENGINE MECHANICAL (G16 ENGINE)
No. 1 Cylinder
No. 2 Cylinder
No. 3 Cylinder
No. 4 Cylinder
Crank
pulley
side
5) Remove cap and using a scale on gaging plastic envelope,
6) If clearance can not be brought to within its limit even by using
1. Gaging plastic
2. Scale
ASSEMBLY
NOTE:
Two sizes of piston are available as standard size spare part
so as to ensure proper piston-to-cylinder clearance. When
installing a standard size piston, make sure to match piston
with cylinder as follows.
1 or 2
a) Each piston has stamped number 1 or 2 as shown. It represents
outer diameter of piston.
Piston
b) There are also stamped numbers of 1 and 2 on the cylinder block
as shown. The first number represents inner diameter of No.1
cylinder, the second number of No.2 cylinder, the third number
of No.3 cylinder and the fourth number of No.4 cylinder.
Flywheel
side
measure gaging plastic width at the widest point (clearance).
If clearance exceeds its limit, use a new standard size bearing
and remeasure clearance.
Item
Bearing
clearance
a new standard size bearing, replace crankshaft or regrind
crankpin to undersize as follows.
– Install 0.25 mm undersize bearing to connecting rod big end.
– Measure bore diameter of connecting rod big end.
– Regrind crankpin to following finished diameter.
Finished
Measured big end
crankpin
=
bore dia. (including
dia.
undersize bearing)
– Confirm that bearing clearance is within above standard val-
ue.
Standard
0.020 – 0.050 mm
(0.0008 – 0.0019 in.)
0.035 mm
(0.0014 in.)
Limit
0.080 mm