Suzuki 2000 Grand Vitara SQ625 Service Manual page 391

Table of Contents

Advertisement

RH (No.2) bank
LH (No.1) bank
1. Cylinder head gasket
2. Crankshaft pulley side
3. Flywheel side
RH (No.2) bank
LH (No.1) bank
1. Hex hole bolt
2. Crankshaft pulley side
3. Flywheel side
1. Crank timing pulley key
2. Oil jet
4. Knock pin
5. "86FA" mark
INSTALLATION
1) Clean mating surface on cylinder head and cylinder block. Re-
move oil, old gasket and dust from mating surface.
2) Install knock pin to cylinder block.
3) Apply sealant "A" to cylinder head gasket as shown in figure.
"A": Sealant 99000-31150
Width "w": Min. 4 mm (0.158 in.)
4) Install new cylinder head gasket to cylinder block as shown in
figure. "86FA" mark on cylinder head gasket should face up (to-
ward cylinder head side).
5) Install cylinder head to block.
After applying oil to cylinder head bolts, tighten them gradually
as follows.
(1) Tighten all bolts to 53 N
numerical order in figure.
(2) In the same manner as in (1), tighten them to 84 N
(8.4 kg-m, 61.0 lb-ft).
(3) Loosen all bolts until tightening torque is reduced to 0 in re-
verse order of tightening.
(4) In the same manner as in (1), tighten them to 53 N
(5.3 kg-m, 38.5 lb-ft).
(5) In the same manner as in (1) again, tighten them to speci-
fied torque.
Tightening Torque
.
(a): 105 N
m (10.5 kg-m, 76.0 lb-ft)
.
(b): 11 N
m (1.1 kg-m, 7.5 lb-ft)
NOTE:
Don't forget to install (b) bolts as shown in figure.
6) Install water outlet cap.
7) Check timing mark on crankshaft as shown in figure.
ENGINE MECHANICAL (H25 ENGINE) 6A2-67
.
m (5.3 kg-m, 38.5 lb-ft) according to
.
m
.
m

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2000 grand vitara sq4162000 grand vitara sq420

Table of Contents