Alcatel-Lucent 7210 SAS M Configuration Manual page 371

Service access switch
Hide thumbs Also See for 7210 SAS M:
Table of Contents

Advertisement

weekday
Syntax
[no] weekday {weekday-number [..weekday-number]|day-name [..day-name]| all}
Context
config>cron>sched
Description
This command specifies which days of the week that the schedule will fire on. Multiple days of the
week can be specified. When multiple days are configured, each of them will cause the schedule to
occur. If a weekday is configured without configuring month, day-of-month,
event will not execute.
Using the weekday command as well as the day-of month command will cause the script to run
twice. For example, consider that "today" is Monday January 1. If "Tuesday January 5" is configured,
the script will run on Tuesday (tomorrow) as well as January 5 (Friday).
The no form of this command removes the specified weekday from the configuration.
Parameters
day-number — Specifies a weekday number.
day-name — Specifies a day by name
all — Specifies all days of the week.
script
Syntax
[no] script script-name [owner owner-name]
Context
config>cron>script
Description
This command configures the name associated with this script.
Parameters
script-name — Specifies the script name.
7210 SAS M, T, X, R6 Basic System Configuration Guide
Values
periodic — Specifies a schedule which runs at a given interval.
specified for this feature to run successfully.
calendar — Specifies a schedule which runs based on a calendar. weekday, month,
day-of-month,
fully.
oneshot — Specifies a schedule which runs one time only. As soon as the first
event specified in these parameters takes place and the associated event occurs, the
schedule enters a shutdown state. month, weekday, day-of-month,
must be specified for this feature to run successfully.
Default
periodic
Values
1 —7 (maximum 7 week-day-numbers)
Values
sunday, monday, tuesday, wednesday, thursday, friday, saturday (maximum 7 week-
day names)
hour
and
minute
must be specified for this feature to run success-
System Management
interval
must be
hour
and
minute
hour
and minute, the
Page 371

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents