Mitsubishi NZ2GFCF-D62PD2 User Manual page 123

Cc-link ie field network high-speed counter module
Table of Contents

Advertisement

(5) Signal timing of the cam switch function
The following figure shows the signal timing of the cam switch function.
• Only Cam switch (Output 1) is used.
• Coincidence output 1 is assigned to CH1.
• "1: Stage 1" is assigned to "Cam switch output unit assignment setting".
• "0: CH1" is assigned to "Cam switch output 1 channel assignment setting".
Controlled by the high-speed counter module
Controlled by the program
ON/OFF status of Cam switch (Output 1)
CH1 Cam switch execute command (RY26)
CH1 Cam switch execute (RX26)
Cam switch status (Output 1) (RWr2.b0)
External output signal of the extension
output module (Y0)
No.
When CH1 Cam switch execute command (RY26) is turned off then on, the step setting of Cam switch (Output 1) is acquired and
1)
CH1 Cam switch execute (RX26) turns on. (If the value is changed while the cam switch function is in operation, the change is
ignored.)
2)
The cam switch function operates when CH1 Cam switch execute (RX26) turns on.
CH1 Present value (RWr10 to RWr11) and the step setting of Cam switch (Output 1) are compared and the result is output from Y0
3)
of the extension output module. The output status can be checked by Cam switch status (Output 1) (RWr2.b0) of Cam switch output
signal (RWr2).
When CH1 Cam switch execute command (RY26) is turned off, the operation is as follows:
• CH1 Cam switch execute (RX26) turns off.
4)
• Cam switch status (Output 1) (RWr2.b0) becomes 0.
• Y0 of the extension output module is turned off.
Δ
*1
For
T
, refer to Page 283, Appendix 4.
3
Cam switch output signal (RWr2) turns on regardless of CH Count enable command (RY24, RY3C).
ON
ON
OFF
OFF
OFF
3 *1
T
ON
1)
OFF
2)
OFF
3)
1
1
0
0
3)
ON
ON
OFF
OFF
OFF
Description
CHAPTER 8 FUNCTIONS
ON
ON
OFF
4)
1
0
ON
OFF
4)
4)
4)
8
121

Advertisement

Table of Contents
loading

Table of Contents