Mitsubishi Q00JCPU User Manual page 328

Hide thumbs Also See for Q00JCPU:
Table of Contents

Advertisement

6
FUNCTIONS
6
- 28
6.6 Remote Operation
6.6.2 Remote PAUSE
POINT
Setting of only the PAUSE contact is not allowed.
When setting the PAUSE contact, also set the RUN contact.
(b) Method with GX Developer, Serial Communication Module etc.
The remote PAUSE operation can be performed from the GX Developer or by
using serial communication module.
Operate GX Developer by choosing [Online]
When executing remote PAUSE from an external device using MC protocol, use
the MC protocol command.
Q Corresponding MELSEC Communication Protocol Reference Manual
• When the END processing is performed for the scan where the remote
PAUSE command was accepted, the PAUSE status contact (SM204) is
turned on.
When the scan after the PAUSE status contact is turned on is executed to the
END process, it enters the PAUSE status and stops the calculations.
• When the remote RUN command is received, the sequence program
calculations are performed again from step 0.
0
Remote PAUSE
command
Remote RUN
command
SM204
RUN/PAUSE
status
0
END
ON
OFF
OFF
ON
OFF
ON when
PAUSE
condition met
RUN
Figure 6.18 PAUSE Time Chart with GX Developer
[Remote operation].
END
0
ON
PAUSE
PAUSE status
0
END

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents