Ricoh OR-C1 Field Service Manual page 35

Table of Contents

Advertisement

5. Remove the front screw [A] (
6. Remove the rear screws [B] (
7. Release the rear tab [C] then front tab [D], then separate the top and bottom.
• Be sure to release the rear tab first and the front tab second.
8. Open the developer pack [A].
9. While turning the black gear [B], slowly move the pack left and right and pour half of the
developer over the auger [C].
10. Continue to turn the black gear until the developer is level.
11. While continuing to turn the black gear, slowly move the pack left and right and pour the remaining
half of the developer over the auger until the developer is level.
x1)
x2)
Copier Installation
2
33

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

D120D139D140D141D121D122

Table of Contents