5.9 Appendix: System integration checklist
This section lists the tasks necessary to complete the system integration. Each task is a link to the corresponding instruc-
tions.
Installation:
1.
Install the power source mains plug
2.
Install the equipment on the stand
3.
Install the cooling unit
4.
Install RCM on the power source
5.
Mount the wire feeder on the robot arm
6.
Connect the protective earth cable
7.
Install the fieldbus module
8.
Install the add-on cards
9.
Connect the cables to the wire feeder
10.
Connect the cables to the power source and RCM
11.
Turn on the welding system
12.
Install the wire guide tubes
13.
Install the feed rolls
14.
Install the gas supply
Configuration:
1.
Connect to the AX Manager user interface
2.
Configure network settings
3.
Configure device settings
4.
Configure robot settings
5.
Configure fieldbus settings
6.
Apply welding programs (configure memory channels)
7.
Make a system backup file