6. Tension the first stage drive belt, see
page 52.
7. Tension the second stage drive belt, see
ment" on
page 56.
8. Tighten the two Generator/Eddy Brake assembly and two Drive Components
assembly carriage bolt fasteners, torque to 180 in-lbs (20.3 Nm).
9. Reconnect the Generator input cable (J1) and Eddy/Brake load cable (J7) on the
LPCA board. Reinstall the LPCA/Battery module cover and secure with the #2 Phillips
screw fastener.
Contact Precor Customer Support at support@precor.com or 800.786.8404 with
any questions.
Drive Components assembly Replacement
"First Stage Drive Belt Tension Adjustment" on
"Second Stage Drive Belt Tension Adjust-
6 Replacement Procedures
Page 125