98
Commissioning
Pos : 67.24.1 /Serie 750 ( WAGO-I/O- SYST EM)/In Betri eb nehmen/F eldbus knoten in Betri eb nehmen/F unktion des F eldbus knotens tes ten - Ü berschrift 2 @ 5\mod_1244635054676_21.doc x @ 35193 @ 2 @ 1
8.3
Testing the Function of the Fieldbus Node
Pos : 67.24.2 /Serie 750 ( WAGO-I/O- SYST EM)/In Betri eb nehmen/F eldbus knoten in Betri eb nehmen/F eldbus knoten testen, Betriebss pannung auss chalten, Schritt 1 @ 5\mod_1244638193434_21.doc x @ 35209 @ @ 1
1.
To ensure that the IP address is correct and to test communication with the
fieldbus node, first turn off the operating voltage of the fieldbus node.
2.
Create a non-serial connection between your PC and the fieldbus node.
Pos : null /Serie 750 (WAGO-I/O-SYST EM)/In Betrieb nehmen/F eldbus knoten i n Betri eb nehmen/H oc hlauf und LEDs (F BK/Contr) @ 34\mod_1550563905003_21.doc x @ 531209 @ @ 1
The head station is initialized. The head station determines the I/O module
configuration of the fieldbus node and creates a process image.
During start-up, the I/O LED (red) flashes.
If the I/O LED lights up green after a brief period, the fieldbus node is operational.
Pos : 67.24.4 /Serie 750 ( WAGO-I/O- SYST EM)/In Betri eb nehmen/F eldbus knoten in Betri eb nehmen/H ochl auf und LEDs - F ehler allgemei n, Hi nweis: Signalisierung/Bli nkc ode-Aus w. @ 4\mod_1243594306433_21.doc x @ 34538 @ @ 1
If an error occurs during start-up indicated by the I/O LED flashing red, evaluate
the error code and argument and resolve the error.
More information about LED signaling
The exact description for evaluating the LED signal displayed is available in the
section "Diagnostics" > ... > "LED Signaling".
Pos : 67.25 /D okumentati on allgemei n/Gli ederungsel emente/---Seitenwec hs el--- @ 3\mod_1221108045078_0.doc x @ 21810 @ @ 1
Manual
Version 1.3.0
WAGO-I/O-SYSTEM 750 XTR
750-352/040-000 FC ETHERNET G3 XTR