17. Slide support (A) off of the bushing halves (B).
NOTE:
Two tine tubes have supports that are assembled
opposite to what is shown. Those supports (A) can be
rotated for the flange to clear the channels before they
can be moved off the bushing. The tine tube can also
be moved outward slightly.
18. Remove the bushing halves (B).
Installing Bushings on 5-, 6- or 9-Bat Reels
WARNING
To avoid bodily injury from fall of raised reel, always engage reel safety props before going under raised
reel for any reason.
IMPORTANT:
Ensure tine tube is supported at all times to prevent damage to the tube or other components.
169899
MAINTENANCE AND SERVICING
Figure 6.181: Support
Figure 6.182: Opposite Support
212
Revision A