Action
Reconnect the battery cable to the SMB battery
pack and secure it with the velcro strap.
Put the SMB/BU unit back into the box and secure
it with its attachment screws.
Update the revolution counter.
DANGER
Make sure all safety requirements are met when
performing the first test run. These are further
detailed in the section
First test run may cause
injury or damage on page
© Copyright 2006-2018 ABB. All rights reserved.
Note
Art. no. is specified in
equipment on page
Shown in figure
battery on page
Shown in figure
battery on page
Detailed in chapter Calibration -
section
ters on page
27.
Required
170.
Location of SMB
169.
Location of SMB
169.
Updating revolution coun-
313.
Product manual - IRB 6620
3HAC027151-001 Revision: T

Advertisement

Table of Contents
loading

Table of Contents