Select Board Tests, then select Run. When the Board Tests are
7
finished, select Done.
Select Data Input Inspection. All lines should show activity. Select
8
Done to exit the Data Input Inspection.
Select Analy PV, then select Sys PV PV in the pop up menu and press
9
the Select key.
Operator's Service
To run the self-tests (1664A)
20-21