How to Ground the Frame in a DC Environment
How to Ground the Frame in a DC Environment
This section describes how to ground the frame in a DC environment.
1. Ensure that
How to Prepare the Cables
690-0108-07) has already been performed.
2. Attach the continuous aisle ground conductor 1/0 to the Ground Window.
Run the conductor to the equipment (see
on page 86).
WARNING: Be sure that there is no connection between Tekelec equipment
frame ground and the frame ground of any other telecommunications equipment.
3. Install the branch ground conductor to the frame using screws and washers.
The continuous aisle ground conductor will be H-tapped to the branch (see
Ground Cable Routes in DC Environment
(AWG) cable ground that runs to the frame will allow removal of a frame from a lineup without
interrupting the grounding of any other frames in the lineup. Torque screws to 45 inch-pounds.

Figure 56: Frame Ground Cable Routes in DC Environment

86
on page 86
on page 85 to prepare the frame ground cable (P/N
Figure 56: Frame Ground Cable Routes in DC Environment
on page 86). The separate #6 American Wire Gauge
910-2969-001 Revision K, June 2009