How to Install aT1100 AS Frame
Using a felt tip pen, mark Anchor locations in the middle of each oval anchor slot. Mark the
corners of the first frame as shown in
56.

Figure 34: Floor Marking Template for HD Frame

4. Create another chalk line that allows 6 inches between each frame for correct spacing.
Align the template (isolator pad) again against the front chalk line and continue the process
of aligning, marking, and moving the template (isolator pad) until the site specific number of
frame spaces has been laid out.
5. This procedure is complete.
Next, do one of the following:
If you are installing the frame on a slab floor, see
If you are installing the frame on a raised floor, see
page 56.
Additional Preparations for Raised Floors
Use the procedures in this section to prepare floors for anchoring frames on raised floors. For
raised floors, you must create cable and anchor holes in the raised floor tiles.
1. Mark the spots where the cable holes are to be drilled.
(The spots where the anchor holes are to be drilled were marked in
on page 55.)
2. Mark the corners of the raised floor tiles to ensure the same tiles will be returned to the same
place when the procedure is complete.
3. Remove the tiles from the equipment area.
4. Use a HEPA vacuum cleaner to collect the shavings while drilling.
Using a carbide-toothed hole saw of the appropriate diameter, drill the cable holes required
in the raised floor tiles. For the anchor holes, drill 1 inch (2.54 cm) diameter holes in the tiles
56
Figure 34: Floor Marking Template for HD Frame
How to Anchor Frame to Slab Floor
Additional Preparations for Raised Floors
910-2969-001 Revision K, June 2009