Note: The mounting position for the additional server may vary. The position shown in
53: Side Cable Management Arm Installation (T1000 AS shown)
T1000 shown, but mounting is the same for the T1100.
15. Route and connect the power and data cables through the cable management arm to the T1100AS
chassis.
Check the labels on the cables and attach them to the appropriate connectors on the rear of the
T1100AS chassis (see
used, see .

Figure 54: T1100 AS Rear Detail

910-2969-001 Revision K, June 2009
Figure 54: T1100 AS Rear Detail
How to Install Hardware in an Existing Frame
on page 78 is for example only.
on page 79). For information about cables