SeeMeCNC Rostock MAX v2 Assembly Manual page 249

Hide thumbs Also See for Rostock MAX v2:
Table of Contents

Advertisement

Fig. 20-14: Loading filament.
Continue to manually feed the filament until it passes through the other push-fit connector on
the hot end.
Now you'll need to heat the hot end in order to
prime it with filament. Once the hot end reaches the
target temperature, I want you to start using the manual
Extrusion button to feed filament into the hot end.
Rostock MAX v2 Assembly Guide
Fig. 20-15: Extruder control.
249

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Rostock MAX v2 and is the answer not in the manual?

Table of Contents