SeeMeCNC Rostock MAX v2 Assembly Manual page 165

Hide thumbs Also See for Rostock MAX v2:
Table of Contents

Advertisement

Rostock MAX v2 Assembly Guide
Attaching the delta arms to the effector with the Cheapskates at the bottom will cause the
platform to be raised off the bed as shown below. This will make the next task a lot easier.
Fig. 12-17: Platform ready for the hot end!
Checkpoint Video #16:
http://youtu.be/6GPLyV_8CZI
165

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Rostock MAX v2 and is the answer not in the manual?

Table of Contents