Thermo Scientific Accela Open Autosampler Hardware Manual page 33

Table of Contents

Advertisement

Installing the Cool Stack
Thermo Scientific
Installing the LC Injection Valve
Mounting the DLW Pump Holder
Tip Use the screwdrivers in Box 1 to install the different parts with the supplied screws.
Follow these instructions to install the cool stack on the table and the x axis on the cool stack.
Note A standard table plate is shipped with a left-side cool stack installation. This
configuration works well with the TSQ Quantum™, Vantage™, and Velos™ mass
spectrometers. On the Exactive™ mass spectrometer, the ion source is mounted to the
right side of the mass spectrometer. To minimize the distance between the autosampler
injection valve and the Exactive ion source, install the stack cooler on the right side of the
table.
To install the cool stack on the table
1. Decide on which side of the table you want the cool stack to be located.
2. If you want to relocate the cool stack, remove and relocate the foot stops to the desired
location
(Figure
5).
Figure 5.
Relocating the foot stops
3. Place the cool stack onto the table in the desired location, ensuring that the mounting feet
reside within the designated cutouts resting on the foot stops in the table.
2
Installing the Accela Open Autosampler
Installing the Autosampler and DLW
Foot stops
Accela Open Autosampler Hardware Manual
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents