Installation troubleshooting
...................................................................................................................................................................................................................................

Procedure A-2: Fan unit test failure

Overview
The procedure described below should be performed if one of the following failures can
be observed:
• The "PWR O " LED does not light up on the fan unit.
Procedure 1 must be used in this case.
ot all fans are running.
Procedure 2 must be used in this case.
• The air flow direction is not from bottom to top.
Procedure 2 must be used in this case.
Procedure 1
Proceed as follows if the "PWR O " LED does not light up on the fan unit:
...................................................................................................................................................................................................
1
Switch all circuit breakers on the subrack backplane (see chapter 5,
switching" (p.
...................................................................................................................................................................................................
Replace all affected fan power cables between the Power Interfaces and the fan unit.
2
Make sure that the cables are tight afterwards.
...................................................................................................................................................................................................
3
Switch all circuit breakers on the subrack backplane to the O position (="I").
IF ...
the "PWR O " LED does not light up
on the fan unit,
the "PWR O " LED lights up on the
fan unit,
E
N D
O F
S T E P S
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................................................
A-4
5-5)) to the OFF position (="O").
Alcatel-Lucent – Internal
Proprietary – Use pursuant to Company instruction
THEN ...
switch all circuit breakers on the subrack backplane to
the OFF position (="O") and replace the affected fan
unit.
E D OF STEPS
Procedure A-2: Fan unit test failure
Figure 5-1, "PI/100
365-374-198R10.5.4
Issue 1 July 2009

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents