E Software Installation - Alcatel-Lucent 1675 LambdaUnite Installation And System Turn-Up Manual

Multiservice switch, release 10.5.4
Hide thumbs Also See for 1675 LambdaUnite:
Table of Contents

Advertisement

General information
...................................................................................................................................................................................................................................
Table 2-3
Main task
Power and ground
cable installation
Internal cable
installation
External cable
installation
Fiber cabling
Side cover plates
(optional)
Rack doors
(optional)
Powering
Fan unit test
®
WaveStar
CIT
installation
E software
installation
Circuit pack
installation
Physical installation
check
...................................................................................................................................................................................................................................
365-374-198R10.5.4
Issue 1 July 2009
Sequence of steps (continued)
Chapter
Subtask [section/page]
number
4
"Power wiring (External battery - PDP)" (p. 4-6)
Procedure 4-1: "Power wiring (PDP - PI/100)" (p. 4-10)
Procedure 4-2: "Ground wiring" (p. 4-20)
Procedure 4-3: "Subrack alarm wiring" (p. 4-30)
"Station alarm wiring" (p. 4-34)
"STM-1e interface" (p. 4-39)
"DS3/EC1 interface" (p. 4-49)
"Miscellaneous Discrete Inputs/Outputs (MDIs/MDOs)" (p. 4-52)
"User byte interfaces (G.703/V.11)" (p. 4-57)
"TI-DS1 Station clock I/O interface (100/110 Ω)" (p. 4-61)
"TI-E1 Station clock I/O interface (120 Ω)" (p. 4-65)
"TI-E1 Station clock I/O interface (75 Ω)" (p. 4-68)
"LA 10/100 Base-T interface" (p. 4-71)
"Optical circuit packs" (p. 4-76)
"Gigabit Ethernet circuit packs" (p. 4-85)
"Fiber engineering rules" (p. 4-88)
Procedure 4-5: "Side cover plates" (p. 4-97)
Procedure 4-6: "Rack doors" (p. 4-100)
5
Procedure 5-1: "Switching on and testing the supply voltage"
(p. 5-4)
Procedure 5-2: "Fan unit test" (p. 5-8)
Procedure 5-3: "WaveStar
Procedure 5-5: " E software installation" (p. 5-19)
Procedure 5-6: "Mounting the circuit packs" (p. 5-54)
"Physical installation check" (p. 5-62)
Alcatel-Lucent – Internal
Proprietary – Use pursuant to Company instruction
®
CIT installation" (p. 5-12)
Sequence of steps
or
or
2-17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents