Network establishment and testing
...................................................................................................................................................................................................................................
Required equipment
Prior to performing this task, the following equipment must be available:
1. WaveStar
2. CAT5 crossover LA cable with RJ-45/RJ-45 connectors (see chapter 4,
"CIT connection (LA crossed)" (p.
Prerequisites
This test can only be done after each E has been prepared for O
"O
S provisioning" (p.
...................................................................................................................................................................................................................................
10-92
®
CIT PC
10-78)).
Alcatel-Lucent – Internal
Proprietary – Use pursuant to Company instruction
4-72))
ONNS test
Overview
Figure 4-48,
S (see section
365-374-198R10.5.4
Issue 1 July 2009