Procedure 10-9: Line Timing Test - Alcatel-Lucent 1675 LambdaUnite Installation And System Turn-Up Manual

Multiservice switch, release 10.5.4
Hide thumbs Also See for 1675 LambdaUnite:
Table of Contents

Advertisement

Network establishment and testing
...................................................................................................................................................................................................................................

Procedure 10-9: Line timing test

Overview
This test verifies the line timing functionality.
Required equipment
Prior to performing this task, the following equipment must be available:
1. WaveStar
2. CAT5 crossover LA cable with RJ-45/RJ-45 connectors (see chapter 4,
"CIT connection (LA crossed)" (p.
Prerequisites
Prior to performing this task, you must have done the following:
1. Set up the line timing test (see section
(p.
2. Logged in to WaveStar
"Starting the WaveStar
been enabled during WaveStar
3. Logged in to E-A.
Test procedure
Proceed as follows to perform the line timing test:
...................................................................................................................................................................................................
1
Start a remote login to E-B.
To do that, enter the following:
• The TID of E-B as NE Name
• 1675 LambdaUnite MSS as NE Type
• OSI as Connection Type.
Click Graphical.
Result:
...................................................................................................................................................................................................
2
In the WaveStar
...................................................................................................................................................................................................................................
365-374-198R10.5.4
Issue 1 July 2009
®
CIT PC
10-18)).
®
®
CIT application" (p.
All units of E-B will be displayed.
®
CIT System View, select View → Timing/Synchronization.
Alcatel-Lucent – Internal
Proprietary – Use pursuant to Company instruction
4-72))
Procedure 10-4: "Line timing test setup"
CIT as Super User (see chapter 5, section
5-18)) if WaveStar
®
CIT installation.
Test procedures
Procedure 10-9: Line timing test
Figure 4-48,
Procedure 5-4:
®
CIT User Login has
10-51

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents