Mechanical installation
...................................................................................................................................................................................................................................
Procedure 3-7: MDIO terminal rail
Overview
The MDIO terminal rail represents the interface between the MDI/MDO interface located
on the CI-CTL panel and the external equipment (e.g. temperature sensor). The
MDI/MDO cabling is described in chapter 4, section
Inputs/Outputs (MDIs/MDOs)" (p.
Mounting
Proceed as follows to mount the MDIO terminal rails:
...................................................................................................................................................................................................
Mount the MDIO terminal rail (SC02071000, item 1) to the rack top (front side) as shown
1
in the figure below.
OTE: Each MDIO terminal rail supports one 1675 LambdaUnite MSS subrack.
Figure 3-14 Mounting the MDIO terminal rail
E
N D
O F
...................................................................................................................................................................................................
...................................................................................................................................................................................................................................
3-24
S T E P S
Alcatel-Lucent – Internal
Proprietary – Use pursuant to Company instruction
"Miscellaneous Discrete
4-52).
ETSI-2 installation
Procedure 3-7: MDIO terminal rail
365-374-198R10.5.4
Issue 1 July 2009