Network establishment and testing
...................................................................................................................................................................................................................................
Procedure 10-20: Path deletion test
Purpose
This test provides a procedure for testing the "path tear-down" functionality of O
Procedure
Proceed as follows to delete the connection between E-A and E-C:
...................................................................................................................................................................................................
Select View → View Paths or Configuration → Delete Path from the map's menu
1
bar.
Result:
...................................................................................................................................................................................................
Select the active connection between E-A and E-C and click Delete.
2
Result:
confirmation message appears. The connection is highlighted on the network map.
...................................................................................................................................................................................................
Click Yes.
3
Result:
to the connection is purged. o signal can be received with "analyzer 1" and
"analyzer 2".
E
N D
O F
...................................................................................................................................................................................................
...................................................................................................................................................................................................................................
10-98
The path table is displayed.
The record will highlight indicating that the record has been selected. A
The View Paths screen is updated to remove the connection. All data related
S T E P S
Alcatel-Lucent – Internal
Proprietary – Use pursuant to Company instruction
ONNS test
Procedure 10-20: Path deletion test
365-374-198R10.5.4
Issue 1 July 2009
S.