Alcatel-Lucent 1675 LambdaUnite Installation And System Turn-Up Manual page 507

Multiservice switch, release 10.5.4
Hide thumbs Also See for 1675 LambdaUnite:
Table of Contents

Advertisement

Network establishment and testing
...................................................................................................................................................................................................................................
ote the following for
E-B: "Switching" will be displayed in the RING Node APS (Automatic
Protection Switch) State field.
E-C and E-D: "Passthrough" will be displayed in the RING Node APS
(Automatic Protection Switch) State field.
...................................................................................................................................................................................................
13
In the WaveStar
Result:
...................................................................................................................................................................................................
Select the existing 4F MS-SPRing# (SDH) or 4F BLSR# (SO ET) in the Ptn Grp tab on
14
the left-hand side of the window and click the Select button.
...................................................................................................................................................................................................
In the Direction group box, select East or West. The choice depends on the West/East
15
port configuration (see section
Important! Select the port which is connected to E-B!
...................................................................................................................................................................................................
From the Switch Type list, select Clear.
16
...................................................................................................................................................................................................
Click Apply and then Yes in the confirmation window.
17
Result:
interruption of about 15 ms can be observed).
...................................................................................................................................................................................................
Check in each E that the RING Node APS (Automatic Protection Switch) State
18
field displays "idle".
...................................................................................................................................................................................................
Close the View Protection window in each E by clicking Close.
19
E
N D
O F
...................................................................................................................................................................................................
Deleting cross-connections
Proceed as follows to delete the established cross-connections:
...................................................................................................................................................................................................
In the WaveStar
1
Delete to delete the established cross-connections.
...................................................................................................................................................................................................................................
365-374-198R10.5.4
Issue 1 July 2009
Step
10:
®
CIT System View of E-A, select Fault → Protection Switch....
The Switch Protection window appears.
An immediate switch to the "Worker" path is caused (a short traffic
S T E P S
®
CIT System View, select Configuration → Cross-Connection →
Alcatel-Lucent – Internal
Proprietary – Use pursuant to Company instruction
Procedure 10-12: 4-fiber MS-SPRing/BLSR test
"Creating a 4-fiber MS-SPRing/BLSR" (p.
Test procedures
10-38)).
10-69

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents