Alcatel-Lucent 1675 LambdaUnite Installation And System Turn-Up Manual page 335

Multiservice switch, release 10.5.4
Hide thumbs Also See for 1675 LambdaUnite:
Table of Contents

Advertisement

Power, software, and circuit pack installation
...................................................................................................................................................................................................................................
...................................................................................................................................................................................................
Push the XC unit (protection) firmly into slot "XC P" (#10).
3
Result:
Troubleshooting: If that is not the case, check that the XC unit is plugged correctly. If
that does not solve the problem, replace the XC unit (protection).
...................................................................................................................................................................................................
4
Insert the other circuit packs with the exception of the CTL protection unit into the
respective slots (one-by-one). Please observe the
the previous section!
Important! Do not insert the packs simultaneously. Insert them one after the other,
with intervals of at least 15 seconds in between.
Result:
Troubleshooting: If the "Active" LED is not flashing on some of the circuit packs,
check that the respective circuit packs are plugged correctly. If that does not solve the
problem, replace these circuit packs.
E
N D
O F
...................................................................................................................................................................................................
Final result
The following can be observed now:
1. The MJ, MN and ABN LEDs on the User Panel are on and no critical alarms are
indicated (CR LED should be off).
2. The "Active" LEDs of all circuit packs are flashing.
This is because the system is still in "maintenance condition" and some system
parameters have not been set. This should be ignored as they will be corrected in a
later procedure (see chapter 7, section
3. If EP51/EL36 or EP51/EL36B circuit packs for DS3 port protection are inserted, a
critical O I alarm ("ECI Mismatch Failure") will be raised after the system
parameters have been provisioned (see chapter 7,
(p.
will be done later.
...................................................................................................................................................................................................................................
365-374-198R10.5.4
Issue 1 July 2009
The "Active" LED must flash after about 20 seconds.
The "Active" LED on each inserted circuit pack must flash.
S T E P S
7-13)). This is because the DS3 1+1 protection group is not yet provisioned. This
Alcatel-Lucent – Internal
Proprietary – Use pursuant to Company instruction
Software and circuit pack installation
Procedure 5-6: Mounting the circuit packs
"Configuration rules" (p. 5-40)
Procedure 7-4: "System parameters" (p.
"Provisioning system parameters"
given in
7-16)).