Use this procedure to create new DCC (Data Communication Channel) terminations. This
is necessary for exchanging network management information between Es and
performing the network establishment procedures described in this chapter as well as the
tests described in chapter
Safety
Electronic components can be destroyed by electrostatic discharge.
Always observe the ESD instructions (cf.
Required equipment
Prior to performing this task, the following equipment must be available:
1. WaveStar
2. CAT5 crossover LA cable with RJ-45/RJ-45 connectors (see chapter 4,
"CIT connection (LA crossed)" (p.
3. ESD wrist strap.
Prerequisites
Prior to performing this task, you must have done the following:
1. Established a protected ring configuration according to section
"Connecting the fiber cables" (p.
2. Plugged XC, CTL and optical I/O circuit packs in each E of the ring.
3. Logged in to WaveStar
"Starting the WaveStar
been enabled during WaveStar
Max. number of active DCC links
The maximum number of simultaneously supported DCC channels per DCC controller is
64 (for CTL/-, CTL/2 and CTL/4) or 180 (for CTL/3).
...................................................................................................................................................................................................................................
10-12
"Test procedures" (p.
NOTICE
ESD hazard
®
CIT PC
®
CIT as Super User (see chapter 5, section
®
CIT application" (p.
Alcatel-Lucent – Internal
Proprietary – Use pursuant to Company instruction
10-50).
"Electrostatic discharge" (p.
4-72))
10-4).
5-18)) if WaveStar
®
CIT installation.
Network establishment
Procedure 10-2: Provision DCC
1-21)).
Figure 4-48,
Procedure 10-1:
Procedure 5-4:
®
CIT User Login has
365-374-198R10.5.4
Issue 1 July 2009

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents