Alcatel-Lucent 1675 LambdaUnite Installation And System Turn-Up Manual page 387

Multiservice switch, release 10.5.4
Hide thumbs Also See for 1675 LambdaUnite:
Table of Contents

Advertisement

8
8
S tand-alone test
procedures
Overview
Purpose
This chapter describes all the tests that should be carried out to check the functionality of
the Es.
Assumptions
Make sure all assumptions listed below are fulfilled before carrying out any tests:
• All Es are mounted and cabled correctly (see chapters 3 and 4).
• The people carrying out the tests are familiar with 1675 LambdaUnite MSS, the SDH
or SO ET functionality, the WaveStar
equipment.
Contents
Procedure 8-1: LED test
Procedure 8-2: Alarm reporting tests
Procedure 8-3: E synchronization test
Procedure 8-4: Optical power meter test
Procedure 8-5: Receiver sensitivity test
Procedure 8-6: DS3 transmission and protection test
Procedure 8-7: Optical port transmission test (daisy chain test)
Procedure 8-8: XC and CTL protection test
...................................................................................................................................................................................................................................
365-374-198R10.5.4
Issue 1 July 2009
Alcatel-Lucent – Internal
Proprietary – Use pursuant to Company instruction
®
CIT software and the handling of the test
8-2
8-3
8-8
8-11
8-16
8-24
8-32
8-38
8-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents