Alcatel-Lucent 1675 LambdaUnite Installation And System Turn-Up Manual page 473

Multiservice switch, release 10.5.4
Hide thumbs Also See for 1675 LambdaUnite:
Table of Contents

Advertisement

Network establishment and testing
...................................................................................................................................................................................................................................
Result:
the respective port are displayed.
...................................................................................................................................................................................................
Select the VC/STS which shall be used as the source and click the Select button.
6
...................................................................................................................................................................................................
Select the destination port which is the interface to the MS-SPRing/BLSR in the Ptn Grp
7
selection tab and the corresponding VC/STS in the Tributary list box.
...................................................................................................................................................................................................
Click the Select button.
8
Result:
Name is grayed out.
...................................................................................................................................................................................................
Select NE-B as the Destination NE Name.
9
...................................................................................................................................................................................................
Click the Apply button to apply your settings.
10
...................................................................................................................................................................................................
Click Close.
11
...................................................................................................................................................................................................
12
Repeat
ote the following differences:
• As Source select the port which is the interface to the MS-SPRing/BLSR.
• As Destination select the port to which the fiber loop is connected.
• Select NE-A as the Source NE Name.
E
N D
O F
...................................................................................................................................................................................................
Reference
The 2-fiber MS-SPRing/BLSR test is described in section
MS-SPRing/BLSR test" (p.
...................................................................................................................................................................................................................................
365-374-198R10.5.4
Issue 1 July 2009
In the Tributary list box on the right, the AIDs of all VCs/STSs belonging to
The current data of the cross-connection are displayed. The Source NE
Step 1
to
Step 11
for E-B.
S T E P S
10-59).
Alcatel-Lucent – Internal
Proprietary – Use pursuant to Company instruction
Procedure 10-6: 2-fiber MS-SPRing/BLSR test setup
Procedure 10-11: "2-fiber
Network establishment
10-35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents