Installation troubleshooting
...................................................................................................................................................................................................................................
Procedure A-1: Power failure
Overview
The procedures described below should be performed if the subrack powering procedure
was unsuccessful.
Procedure 1 must be used if the measured voltage at the termination blocks of the PDP
does not lie between –40.5 and –72 V.
Procedure 2 must be used if the "PWR O " LED does not light up on the user panel.
Procedure 1
Proceed as follows if the measured voltage at the termination blocks of the PDP does not
lie between –40.5 and –72 V:
...................................................................................................................................................................................................
1
Switch off the external battery.
...................................................................................................................................................................................................
Replace all affected power supply lines between the external battery and the termination
2
blocks of the PDP. Make sure the cables are tight afterwards.
...................................................................................................................................................................................................
Switch on the external battery.
3
IF ...
the measured voltage does not lie
between –40.5 and –72 V,
the measured voltage lies between
–40.5 and –72 V,
E
N D
O F
S T E P S
....................................................................................................................................................................................................................................
Procedure 2
Proceed as follows if the "PWR O " LED does not light up on the User Panel:
...................................................................................................................................................................................................
1
Switch all circuit breakers on the subrack backplane (see chapter 5,
switching" (p.
...................................................................................................................................................................................................................................
A-2
5-5)) to the OFF position (="O").
Alcatel-Lucent – Internal
Proprietary – Use pursuant to Company instruction
THEN ...
check the external battery.
E D OF STEPS
Procedure A-1: Power failure
Figure 5-1, "PI/100
365-374-198R10.5.4
Issue 1 July 2009