Inlet and Outlet Module Procedures
Selecting Inlet Module Priority
4
Select the rack or bin indication, and then enter a number from 1-6 followed by Enter
(1 being highest priority and 6 being lowest).
5
After setting all priorities, select Enter
priority settings (i.e. two racks with the same priority number), the Enter
not available until the conflict is corrected.
6
Select Auto
The changed priority settings take effect immediately. In the example shown, STAT,
Routine, and Bypass racks take priority over the bulk feeder bins and the Remap rack.
The Bulk feeder bins also take priority over the Remap rack.
Figure 2.4 Rack Priority Setting - User-Defined Settings
The priority rules for rack and bin loading are as follows:
Bulk Inlet Bin 1 and 2 have consecutive priority
settings
Bulk Inlet Bin 1 and 2 do not have consecutive
priority settings and an Inlet rack with priority in
between the two Bins is loaded
2-6
and OK
to resume operation.
Bulk Inlet Bin Priority
and Exit
. If there is any conflict with the
Bulk Inlet Loading Operation
1.
Inlet racks with higher priority (if any)
operate first.
2.
Both bins are considered equal priority and
operate at the same time. Load samples
from each bin until they both become
empty.
3.
Any Inlet racks with lower priority (if any)
will load once the bins become empty.
1.
Inlet racks with higher priority (if any)
operate first.
2.
The higher priority bin operates until it
becomes empty.
3.
The Inlet rack(s) will load until they become
empty.
4.
The lower priority bin will then load until it
becomes empty.
5.
Any Inlet racks with lower priority (if any)
will load once the bins become empty.