Beckman Coulter Power Express Instructions For Use Manual page 65

Inlets and outlets modules for in vitro diagnostic use
Hide thumbs Also See for Power Express:
Table of Contents

Advertisement

samples are
completed,
samples are not
completed,
e. On the analyzer connection module control panel, Select Enter
16
At the AU5800 and AU5800XL Rack Builder modules:
a. If a stopper is jamming the sample tube carrier, push it forward to release the
carrier.
b. If a tube is in the loading arm gripper, remove the tube and place back into the
empty sample carrier at the barcode reader.
c. If tubes are in the loading racks remove the tubes and set aside.
d. If tubes are in the unloading arm grippers remove the tubes and place the tubes
back into the rack at the Unloading position. Re-adjust any other tubes in the
Unload rack so that the tubes start at position 1 and have no empty spaces.
e. Block any tubes behind RF01 position. Select Auto
module back into operation. Allow the system to load any tubes at RF01 into the
loading rack. The system blocks remaining tubes behind RF01.
f.
Place the tubes that you removed in the shuttle carrier cups at the orientation
station one by one.
g. The system loads tubes in the orientation stations into the loading rack.
h. Repeat steps f and g until all tubes are reloaded.
i.
When completed, remove the blockage at RF01.
17
At the DxH Rack Builder modules:
a. If a stopper is jamming the sample tube carrier, push it forward to release the
carrier.
b. If a tube is in the loading arm gripper, remove the tube and place back into the
empty sample carrier at the barcode reader.
c. If tubes are in the loading racks remove the tubes and set aside. If there are any
loading racks in the upper transfer shuttle, remove them and collect the tubes from
the racks.
d. If a tube is in the unloading arm gripper remove the tubes and place the tubes back
into the rack at the Unloading position. Re-adjust any other tubes in the Unload rack
so that the tubes start at position 1 and have no empty spaces. If there are any racks
in the upper unload shuttle area, remove the racks and set them aside.
B31451AE
If...
Open the connection unit door, retrieve the samples. Transfer these
tubes to the sample tube carriers that are waiting to be unloaded at the
Connection Module (SN031). Place the Connection Unit in Mode
(Recovery) to release the completed samples. Close the connection unit
door.
Open the connection unit door, retrieve the samples. Transfer these
tubes to an offline instrument rack and load the samples as a STAT rack.
When completed, manually unload the samples and place the tubes into
the sample tube carriers that are waiting to be unloaded at the
Connection Module (SN031). Close the connection unit door.
Error Recovery Procedures
System Error Recovery Procedures
Then...
and Exit
and OK
to place the
3
96
.
3-11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents