Beckman Coulter Power Express Instructions For Use Manual page 54

Inlets and outlets modules for in vitro diagnostic use
Hide thumbs Also See for Power Express:
Table of Contents

Advertisement

Inlet and Outlet Module Procedures
Unload the Outlet Module
5
Load empty racks into the vacant positions. After a rack is placed in an empty position,
the position displays the Rack Exchange Completed icon
6
Close the open drawers.
7
Select Restart
the control panel is green after the rack change function is performed correctly.
2-16
Note
If the position still displays Rack Exchange Required
performed too quickly and was not recognized. Repeat steps to remove and replace
the rack in the Outlet.
Note
If you make a mistake during the rack exchange process (for example, changed the
wrong rack), return the original rack to its original position. Select the Rack
Exchange Completed icon
Exchange Not Required icon
on the control panel to resume operation. The Rack Change screen on
on the control panel so that it changes to the Rack
.
.
, the rack exchange was
B31451AE

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents