Table Ii - Komatsu 830E-AC Shop Manual

Dump truck, serial numbers a30001-a30035
Hide thumbs Also See for 830E-AC:
Table of Contents

Advertisement

Battery and Control Circuit Checks -
Battery Power ON
Make sure that the link voltage is drained down
before
servicing
the
performing tests.
1. Prepare for the following checks by performing
the following procedure:
a. Remove the 50 amp fuse (BATFU) from the left
wall of the right side compartment of the
control cabinet.
b. Disconnect circuit wire 21B from the starter
solenoid.
c. Plug in all the cards in the ICP panel. Verify
that all the CN connectors are connected and
control power switch (1, Figure 3-1) is OFF.
d. Verify that all circuit breakers are closed and
the
battery
disconnect
deactivated.
e. Make sure that the key switch and the 5 minute
delay timer are OFF.
Power Supply Check (PS):
2. Remove the CN1 connector on the power supply.
Use an ohmmeter to check the harness side
connector pins to ground. Refer to Table II for the
resistance value at each pin.
3. Check for 1.4K ohms between TB3-K and TB3-L
(LEM +24V to -24V power supply busses).
4. After resistance checks are complete, reconnect
CN1 connector.
E3-8
propulsion
system
or
switches
are
AC Drive System Electrical Checkout Procedure
(Version 21 Software)
TABLE II. POWER SUPPLY HARNESS
RESISTANCE CHECKS
Pin
Ohms
Circuit
1
27
+5
2
27
+5
3
27
+5
4
27
+5
5
27
+5
6
27
+5
7
8
12K
+5
9
12K
+5
10
12K
+5
11
27
+5
12
0
return
13
0
return
14
0
return
15
0
return
16
0
return
17
0
return
18
19
0
return
20
0
return
21
0
return
22
23
770
+15
24
770
+15
25
770
+15
26
770
+15
27
28
210
+15
29
210
+15
30
0
return
31
0
return
Pin
Ohms
Circuit
32
0
return
33
0
return
34
0
return
35
0
return
36
0
return
37
0
return
38
1K
-15
39
1K
-15
40
1K
-15
41
1K
-15
42
0
return
43
44
0
return
45
0
return
46
860
+24
47
50
BP24
48
860
+24
49
50
51
52
53
54
0
return
55
0
return
56
1.4K
-24
57
8K
psstat
58
1.4K
-24
59
60
61
62
10/06 E03018