10. Install the orange wire seal over the field coil
leads. Install the two terminal sockets into plug
assembly (30). Install orange wedge (32) to lock
the sockets into the plug.
FIGURE 10-128.
30. Plug Assembly
NOTE: Ensure the brown wire in the plug assembly
corresponds to the white wire in the receptacle
assembly. Ensure the red wire corresponds with the
black wire.
D10-70
32. Wedge
Battery Charging Alternator
11. Connect plug assembly (30) with receptacle
assembly (33).
FIGURE 10-129.
30. Plug Assembly
®
12. Apply Dow Corning
equivalent, onto all electrical connections. Also,
seal the opening where the field coil leads enter
the control unit.
FIGURE 10-130.
33. Receptacle
Assembly
1-2577 low VOC RTV, or
D10003 07/06