Assembly
1. A suitable seal press ring or plug and two small
wood blocks should be available.
2. The following seal installation procedures are
outlined for use with a vise, but they can be
adapted for use with a press if one is available.
3. Open the vise jaws wide enough to accept the
combined thickness of the flange, wood blocks
and press ring.
4. Place the wood blocks flat against the fixed jaw
of the vise. Place the flange plate against the
blocks in such a position that the bearing pro-
jections are between the blocks and clear of the
vise jaw, refer to Figure 3-8.
5. Lubricate the seals with hydraulic oil. Position
the inboard shaft seal (3, Figure 3-9) with the
metal face toward the outboard end of the
flange.
FIGURE 3-8. SHAFT SEAL INSTALLATION
1. Flange
2. Wood Blocks
L3-10
3. Bearing Projection
Hydraulic Component Repair
6. Position the press ring over the seal. Make sure
that the seal stays centered and true with the
bore, and start applying pressure with the vise.
Continue pressing the seal until it just clears the
snap ring groove in the bore.
7. Install snap ring (2, Figure 3-9). Make sure the
snap ring opening is over the weep hole (10).
8. Install the Outboard seal (metal face out), until it
just contacts the snap ring.
FIGURE 3-9. SHAFT SEAL INSTALLATION
1. Outboard Shaft Seal
2. Snap Ring
3. Inboard Shaft Seal
4. Seal, Metal Face
5. Flange
6. Steel Ball
7. O-Ring
8. Bearing
9. Bearing
10. Weep Hole
11. Plug
12. Dowel
13. Gear Plate
14. Thru Studs
L03039

Advertisement

Table of Contents
loading

Table of Contents