Download Print this page

Renesas HS0005KCU04HE User Manual page 83

Multi-core emulator

Advertisement

4. Set the configuration file name. The configuration file saves the state of High-performance
Embedded Workshop except for the emulator.
Figure 4.9 [New Project –8/9– Setting the Debugger Options] Dialog Box
This is the end of the emulator setting.
Exit the Project Generator according to the instructions on the screen. The High-performance
Embedded Workshop is activated.
5. After the High-performance Embedded Workshop has been activated, connect the emulator.
However, it is not needed to connect the emulator immediately after the High-performance
Embedded Workshop has been activated.
To connect the emulator, use one of the methods (a) and (b) below. For operation during
connection, refer to section 3.10, System Check.
Section 4 Preparations for Debugging
Rev. 1.00 Nov. 26, 2007 Page 63 of 230
REJ10J1766-0100

Advertisement

loading

This manual is also suitable for:

Superh e10a-usb