Installation - Thermo Scientific Accela UV/Vis Plus Hardware Manual

Table of Contents

Advertisement

Installation

Thermo Scientific
To install the Accela UV/Vis Detector as part of an Accela UHPLC system, use the
"Installation Checklist"
on
Contents
Installation Checklist
Unpacking and Inspecting the UV/Vis Detector
Placement and Environmental Requirements
Checking the Power Setting and Fuses
Installing the LightPipe Flow Cell
Installing the Standard Analytical Flow Cell
Making the Back Panel Connections
Turning On the UV/Vis Detector for the First Time
page 10
and follow the procedures in this chapter.
Accela UV/Vis Detector Hardware Manual
2
9

Advertisement

Table of Contents
loading

Table of Contents