Installation
Thermo Scientific
To install the Accela UV/Vis Detector as part of an Accela UHPLC system, use the
"Installation Checklist"
on
Contents
•
Installation Checklist
•
Unpacking and Inspecting the UV/Vis Detector
•
Placement and Environmental Requirements
•
Checking the Power Setting and Fuses
•
Installing the LightPipe Flow Cell
•
Installing the Standard Analytical Flow Cell
•
Making the Back Panel Connections
•
Turning On the UV/Vis Detector for the First Time
page 10
and follow the procedures in this chapter.
Accela UV/Vis Detector Hardware Manual
2
9