3 Installation
3.1 Facility Requirements
The installation site must meet the following requirements:
•
The main power switch and the main power receptacle are on the rear panel. Make sure
that
♦ Free and unrestricted access to the main power switch is ensured at all times.
♦ The power cord of the device can be easily reached and disconnected from the power
line at all times. Provide sufficient space behind the device to unplug the cable.
•
Make sure that the installation site meets the power and environmental specifications
listed in the Technical Information section (→ page 117).
•
Install the detector in the laboratory on a stable surface that is free of vibrations.
•
Make sure that the surface is resistant to solvents.
•
Avoid locations with extreme changes in temperature.
•
Avoid direct sunlight and high humidity.
•
Allow sufficient clearance behind and to the sides of the detector for ventilation.
Operating Instructions
Fluorescence Detectors FLD-3100 and FLD-3400RS
UltiMate 3000 Series:
Page 29