Installation; Facility Requirements - Thermo Scientific Dionex UltiMate 3000 Series Operating Instructions Manual

Fluorescence detectors
Hide thumbs Also See for Dionex UltiMate 3000 Series:
Table of Contents

Advertisement

3 Installation

3.1 Facility Requirements

The installation site must meet the following requirements:
The main power switch and the main power receptacle are on the rear panel. Make sure
that
♦ Free and unrestricted access to the main power switch is ensured at all times.
♦ The power cord of the device can be easily reached and disconnected from the power
line at all times. Provide sufficient space behind the device to unplug the cable.
Make sure that the installation site meets the power and environmental specifications
listed in the Technical Information section (→ page 117).
Install the detector in the laboratory on a stable surface that is free of vibrations.
Make sure that the surface is resistant to solvents.
Avoid locations with extreme changes in temperature.
Avoid direct sunlight and high humidity.
Allow sufficient clearance behind and to the sides of the detector for ventilation.
Operating Instructions
Fluorescence Detectors FLD-3100 and FLD-3400RS
UltiMate 3000 Series:
Page 29

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fld-3100Fld-3400rs

Table of Contents