Installation
Thermo Scientific
This chapter describes the initial installation of the PDA detector, including the connections
to other chromatographic instrumentation. The installation checklist, on the back of this
page, is an abbreviated version of this chapter that you can use as a quick reference for
conducting a successful installation. Make a copy of the checklist, fill it out when the
installation is complete, and include it in your maintenance records.
Contents
•
Installation Checklist
•
Unpacking and Inspecting the Instrument
•
Making Initial Instrument Preparations
•
Making the Back Panel Connections
•
Installing the LightPipe Flowcell
•
Connecting the Remote Outputs
•
Turning On the Detector for the First Time
•
Completing the Installation and Verifying Operation
Accela PDA Detector Hardware Manual
2
9