11. Check for gas leak at supply line as per service hints
in this section.
12. Turn the main gas valve on and turn the gas control
valve to the pilot position.
13. Check for gas leak at the gas control valve and main
gas valve per step 11 of this section. If there are no
leaks, continue to step 14.
If a leak is detected, shut off gas valves and repair
leak. Escaping gas could cause an explosion, and
personal injury and property damage could result.
14. With the gas cock dial at PILOT, depress the dial
and light the pilot burner per paragraph 5-18.
n occasion, it
may be necessary to m&e electrical
6 L.<',i:
'Gus' P
conversion to a fryer. Factory conversion kits are avail-
able and should be used. The following procedures de-
scribe these conversions.
208 Volts to 220/240 Volts:
The only change necessary is to remove the 208 volt
heating elements and replace them with 220/240 volt
heating elements.
elay timers must be changed on
variable temperature models.
oks to 208 volts:
nly change necessary is to remove the 220/240 volt
ng elements and replace them with 208 volt heat-
ing elements.
elay timers must be changed on vari-
able temperature models.
base to Three
factory conversion kit
r 14034) is avail-
r this conversion.
des all necessary
ents and a wiring diagram.
C,.,~)