Verifying the Instrument Performance
Verifying the
Instrument
Performance
Notes
Applied Biosystems 7300/7500/7500 Fast Real-Time PCR System Installation and Maintenance Guide
Before Starting
the Installation
Unpacking and
Setting Up the
Instrument
Installing the
Software and
Powering On the
Instrument
Performing the
ROI Calibration
Performing the
Background
Calibration and
Optical Calibration
Performing the
Pure Dye
Calibration
Powering Off the
7300/7500/
7500 Fast System
®
Preparing the TaqMan
RNase P Verification Plate
Creating a Plate Document
for the RNase P Verification
Performing the
Verification Run
®
Analyzing the TaqMan
RNase P Plate Data
Troubleshooting
Chapter 7
See page 90
See page 92
See page 93
See page 94
See page 99
87
7