Select Instrument
5.
In the Function Test dialog box:
6.
Click
a.
Examine the Pass/Fail column:
b.
• If all the function tests Pass, go to
step
7.
• If any of the function tests Fail, see
"Troubleshooting – Function Tests" on
page
33.
Click
.
c.
Select File Close to close the plate document.
7.
When the software prompts you to save the plate
8.
document, click
In the SDS software, select File Exit.
9.
Continue with
"Performing the Regions of Interest
(ROI) Calibration" on page
Notes
Applied Biosystems 7300/7500/7500 Fast Real-Time PCR System Installation and Maintenance Guide
Chapter 3 Installing the Software and Powering On the Instrument
Function Test.
.
.
35.
Performing the Instrument Function Test
Select
a
Function Test – All tests passed.
Function Test – Lamp test failed.
Select
3
b
c
31