Recommended Maintenance Schedule - Applied Biosystems 7300 Installation And Maintenance Manual

Real-time pcr system
Hide thumbs Also See for 7300:
Table of Contents

Advertisement

Appendix A

Recommended Maintenance Schedule

Semi-Annual
Maintenance
Tasks
January
July
Su M T W Th F S
Su M T W Th F S
6 Months
Miscellaneous
Maintenance
Tasks
Notes
106
Applied Biosystems 7300/7500/7500 Fast Real-Time PCR System Installation and Maintenance Guide
• Perform a background calibration (see
• Perform an optical calibration on 7500/7500 Fast systems (see
• Perform a region of interest (ROI) calibration (see
• Perform a pure dye calibration (see
You can run a background calibration to check for contamination.If any parts of
Note:
the optics are replaced or moved, you must run a background calibration, an ROI
calibration, an optical calibration (7500/7500 Fast only), and a pure dye calibration.
Perform the following tasks as needed to resolve problems as they arise:
• Decontaminate the sample block (see
• Move the 7300/7500/7500 Fast system (see
• Replace the halogen bulb (see
• Replace the instrument fuses (see
• Update the Microsoft Windows operating system (see
page
49)
page
page
67)
page
108)
page
115)
page
117)
page
122)
page
page
59)
35)
124)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

75007500 fast

Table of Contents