Moving the 7300/7500/7500 Fast System
PHYSICAL INJURY
HAZARD. Do not attempt to lift the instrument or
any other heavy objects unless you have received
related training. Incorrect lifting can cause painful and
sometimes permanent back injury. Use proper lifting
techniques when lifting or moving the instrument. At
least 2 people are required to lift the 7300/7500/7500
Fast instrument.
Moving your Applied Biosystems
IMPORTANT!
7300/7500/7500 Fast Real-Time PCR System can
create subtle changes in the alignment of the
instrument optics.
Load the packing plate or empty 96-well plate in
1.
the instrument.
Manually raise the block: from the ROI Inspector
2.
window:
Click
(or select File New).
a.
In the New Document wizard,
b.
click
.
In the SDS software, select
c.
Instrument Calibrate.
In the warning dialog box, click
d.
lower the sample block.
The ROI Inspector dialog box opens.
In the ROI Inspector dialog box,
e.
click
Move your 7300/7500/7500 Fast system
3.
according to the guidelines on
Connect the components of the system (see
4.
"Setting Up the 7300/7500/7500 Fast
Instrument" on page
20).
Notes
Applied Biosystems 7300/7500/7500 Fast Real-Time PCR System Installation and Maintenance Guide
to
.
page
12.
Appendix A
Moving the 7300/7500/7500 Fast System
A
115