Installing a three-cabinet system
EC1
BC
Figure 4-57
HiPath 3750 - Installing a Three-Cabinet System (Stacked)
Laying the Connecting Cables
To lay the cables between the BC and EC2, remove the lower grills in the two rear covers.
●
To lay the connection cables between stacked cabinets, you can cut out the pre-stamped
●
recesses in the bottom of EC1 and the top of the BC with a pair of diagonal cutting pliers
and break them out with a pair of flat-nosed pliers.
Caution
7
Be careful when breaking out the recesses. Remove any sharp edges and corners.
P31003-H3560-S403-54-7620, 09/05
HiPath 3000 V6.0, HiPath 5000 V6.0, Provisional Service Manual
Inside
the cabinet
EC2
Installing HiPath 3750, HiPath 3700
EC1
BC
Installing HiPath 3000
Washers
EC2
inst_h3.fm
4-105