Figure 4-57 Hipath 3750 - Installing A Three-Cabinet System (Stacked) - Siemens HiPath 5000 Service Manual

Hide thumbs Also See for HiPath 5000:
Table of Contents

Advertisement

Installing a three-cabinet system
EC1
BC
Figure 4-57
HiPath 3750 - Installing a Three-Cabinet System (Stacked)
Laying the Connecting Cables
To lay the cables between the BC and EC2, remove the lower grills in the two rear covers.
To lay the connection cables between stacked cabinets, you can cut out the pre-stamped
recesses in the bottom of EC1 and the top of the BC with a pair of diagonal cutting pliers
and break them out with a pair of flat-nosed pliers.
Caution
7
Be careful when breaking out the recesses. Remove any sharp edges and corners.
P31003-H3560-S403-54-7620, 09/05
HiPath 3000 V6.0, HiPath 5000 V6.0, Provisional Service Manual
Inside
the cabinet
EC2
Installing HiPath 3750, HiPath 3700
EC1
BC
Installing HiPath 3000
Washers
EC2
inst_h3.fm
4-105