5.2.2
Supplying the System with Power
Procedure
Step
1.
Plug in the power supply cable for the system cabinet(s).
2.
Position all LUNA2 power supply switches to "DC-ON".
Note: Startup does not begin until the switches on all LUNA2 units are in "DC-ON"
position.
3.
Monitor the RUN LED of the CBSAP. The individual steps of the system boot
(Table 5-2) can be observed this way.
RUN LEDHiPath 3800
The CBSAP features a RUN LED that signals the system boot status in three phases:
Phase 1: Basic tasks (recovery, database, query) are started.
●
Phase 2: Loadware is installed for peripheral boards.
●
Phase 3: Data is installed for peripheral boards.
●
The RUN LED flashes at a different rhythm to indicate each specific phase. The phases are
always separated by a 3-second pause during which the LED is not lit.
Table 5-2
RUN LED - LED Status Meaning
RUN LED
1st flash-
2nd flash-
ing
ing
rhythm
rhythm
short
short
short
long
short
long
Definition of the flashing rhythms:
short = 0.25 s on/0.25 s off
●
long = 0.75 s on/0.25 s off
●
The HiPath 3800 is ready when the date "1. JAN 00" and the time "00:00" appear in
>
the display on the system telephone.
P31003-H3560-S403-54-7620, 09/05
HiPath 3000 V6.0, HiPath 5000 V6.0, Provisional Service Manual
3rd flash-
ing
rhythm
long
Phase 1: Basic tasks (recovery, database, query) are
started.
short
Phase 2: Loadware is installed for peripheral boards.
long
Phase 3: Data is installed for peripheral boards.
Activity
Meaning
start_h3.fm
Starting Up HiPath 3000
Starting Up HiPath 3800
5-3