Supplying The System With Power; Table 5-2 Run Led - Led Status Meaning - Siemens HiPath 5000 Service Manual

Hide thumbs Also See for HiPath 5000:
Table of Contents

Advertisement

5.2.2

Supplying the System with Power

Procedure
Step
1.
Plug in the power supply cable for the system cabinet(s).
2.
Position all LUNA2 power supply switches to "DC-ON".
Note: Startup does not begin until the switches on all LUNA2 units are in "DC-ON"
position.
3.
Monitor the RUN LED of the CBSAP. The individual steps of the system boot
(Table 5-2) can be observed this way.
RUN LEDHiPath 3800
The CBSAP features a RUN LED that signals the system boot status in three phases:
Phase 1: Basic tasks (recovery, database, query) are started.
Phase 2: Loadware is installed for peripheral boards.
Phase 3: Data is installed for peripheral boards.
The RUN LED flashes at a different rhythm to indicate each specific phase. The phases are
always separated by a 3-second pause during which the LED is not lit.
Table 5-2
RUN LED - LED Status Meaning
RUN LED
1st flash-
2nd flash-
ing
ing
rhythm
rhythm
short
short
short
long
short
long
Definition of the flashing rhythms:
short = 0.25 s on/0.25 s off
long = 0.75 s on/0.25 s off
The HiPath 3800 is ready when the date "1. JAN 00" and the time "00:00" appear in
>
the display on the system telephone.
P31003-H3560-S403-54-7620, 09/05
HiPath 3000 V6.0, HiPath 5000 V6.0, Provisional Service Manual
3rd flash-
ing
rhythm
long
Phase 1: Basic tasks (recovery, database, query) are
started.
short
Phase 2: Loadware is installed for peripheral boards.
long
Phase 3: Data is installed for peripheral boards.
Activity
Meaning
start_h3.fm
Starting Up HiPath 3000
Starting Up HiPath 3800
5-3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hipath 3000Hipath 3800

Table of Contents