ATM Network
Criteria
Default
Gateway 1
192.168.10.3/24
Maintenance IP
FC
Fibre
Channel
FC
Switch 1
Fabric
Figure 3-2
•
A LC to SC fiber cable is needed to connect the UltraNet Edge
3000 to a Brocade 2000 Series Switch.
•
A LC to LC fiber cable is needed to connect the UltraNet Edge
3000 to a Brocade 3000 Series Switch.
•
The Brocade and McData switches need specific flash parameters
specified (see the chapter on "Brocade Switch Requirements" in
the UltraNet Edge Storage Router - 3000 Series Release Notes, part
number 30200581).
•
The FCCNT card auto-senses the attached port speed and adjusts
accordingly.
UltraNet ConfigManager
When you perform the initial TCP/IP configuration using the
UltraNet ConfigManager, the PC which has UltraNet ConfigManager
installed on it, must be on the same LAN and subnet as the Ethernet
maintenance interface.
Figure 3-2 is an example of an ATM OC-3 network using two
UltraNet Edge 3000s in a 1x1 configuration with an ATM WAN.
Personal
Computer 1
192.168.10.1/24
UltraNet
Edge 10
192.168.144.16/24
Example ATM WAN with two UltraNet Edge 3000s
Maintenance IP
192.168.20.1/24
ATM OC-3
Cloud
192.168.144.32/24
Network Design Criteria
Network Design
Default
Gateway 2
192.168.20.3/24
FC
Fibre
UltraNet
Channel
Edge 20
FC
Switch 2
Fabric
3
3-5
Need help?
Do you have a question about the ULTRANETTM EDGE STORAGE ROUTER 3000 and is the answer not in the manual?
Questions and answers