(3) Preparation of indoor unit
(a) Mounting of connecting wires
S SRK25, 35GZ-L1
(i)
Remove lid
(ii) Remove cover, terminal block cover
(iii) Insert connecting wire to terminal block securely.
1 Insert connecting wire up to the terminal block securely. If
poor insertion of conductor may result in imperfect contact
between the conductor and the terminal causing heat genera-
tion which may result in fire hazard.
2 Be careful not to confuse terminal numbers of connecting
wire between indoor and outdoor unit.
3 Use wiring clamp for connection wiring to avoid loosening
of the wire.
(iv) Install cover, terminal block cover.
(v)
Install lid.
S SRK502Z-L
(i)
Open the suction grille, then remove the lid.
(ii) Remove the wiring clamp.
(iii) Pass the connecting wire to terminal block from behind of indoor
unit.
(iv) Connect the connecting wire securely to the terminal block.
1 Connect the connection wire securely to the terminal block. If
the wire is not affixed completely, contact will be poor, and it
is dangerous as the terminal block may heat up and catch fire.
2 Take care not to confuse the terminal numbers for indoor and
outdoor connections.
3 Affix the connection wire using the wiring clamp.
(v)
Fix the connecting wire by wiring clamp.
(vi) Attach the lid.
(vii) Close the suction grille.
1 Brown
2 Blue
3 Black
Yellow/Green
Note (1) Connection wiring should not exceed 15 m. If this length is exceeded, communication
errors are likely to occur between the outdoor and indoor units, which could stop the air
conditioner.
(b) Protective taping (Protect the cable with tape at the section where the cable passes through the hole opened on the wall.)
(c) Forming of pipe (Holding down the pipe at the root, change the pipe direction, extend it and adjust according to the
circumstance.)
[When the pipe is extended to left and taken out from the rear center]
(Drain pipe relocation procedure)
1. Remove the drain pipe.
¡ Loosen the spring clamp
to remove.
For power supply, indoor outdoor
Connecting wiring
Indoor/outdoor signal wire (Low voltage)
Earth wiring terminal
2. Remove the drain cap.
3. Insert the drain cap.
¡ Remove by hand or use
¡ Securely insert the drain
cutting pliers, etc.
Note:If it is inserted insuffi-
Cover
Lid
Terminal
block
4. Connect the drain pipe.
¡ Loosen the spring clamp
cap removed in the step
and securely insert the
2.
drain pipe.
Note:If it is inserted insuffi-
ciently, water leakage
ciently, water leakage
could result.
SRK-GZ
Earth
Wiring
Terminal
Connecting Wiring
Terminal Block
Wiring Clamp
Terminal Block Cover
Pull the part marked
while pushing
its part in the direction of allow so as to
dismount it. (Dismount or detach it for
each side).
Suction grille
Connection wire
Wiring clamp
Screw
33

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Srk35gz-l1Srk502z-l1Srk502z-lSrk328henf-l2Srk408henf-l2Srk501henf-l ... Show all

Table of Contents