Mitsubishi Heavy Industries SRK25GZ-L1 Handbook page 164

2000 air conditioning & heat pump machinery handbook
Table of Contents

Advertisement

SCM-HG
(4 room)
(c) Installation
12
Ceiling
15
(d) Installation procedure
Use the bolts (M8 × 2) to secure the
1)
suspension hardware so that it is 90 mm
below the ceiling surface.
2)
Use the band to tightly secure the flexible
duct (ø 150) to the air outlet chamber and
duct joint on the indoor unit itself so that
it will not come off and there will be
escaping of air. Be sure to insulate this area
from the top with heat insulation in order
to prevent condensation.
3)
Use pan-head screws to secure the air
outlet panel to the air outlet chamber. At
this time, make sure there are no gaps
between the air outlet chamber and the air
outlet panel.
Note (1) If the outer covering of the flexible duct breaks, it
can be repaired with tape or other such material.
Escaping air could cause condensation.
162
357 (Suspension bolt pitch)
333
166.5
Round duct
connection port
10
377 (Ceiling opening dimension)
407
Suspension bolt (M8)
Flat washer (M8)
Flat washer (M8)
12
Suspension bolt M8 × 2
166.5
(Procured by customer)
Air outlet chamber
10
Air outlet panel
15
Nut (M8)
Nut (M8)
Flexible duct (ø 150)
Provide heat insulation
Unit: mm
83
91
45.5
45.5
52.5
52.5
15
105
15
(Ceiling opening dimension)
135
Air outlet chamber
Air outlet panel
Indoor unit

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Srk35gz-l1Srk502z-l1Srk502z-lSrk328henf-l2Srk408henf-l2Srk501henf-l ... Show all

Table of Contents